Donetsk, Aug 22 — DAN. A vessel chartered by the RosKapstroy construction company has delivered to Mariupol a new batch of prefabricated houses produced in Crimea, the Russian Construction Ministry press service reported on Tuesday.
“One apartment building can be assembled from three prefabricated home kits, ” the Ministry said. A kit includes concrete wall sections, elevator shafts, ventilation units, stairways and broadsteps. The ship arrived in Mariupol from Sevastopol.
The Mariupol port resumed operation in late May 2022 as it dispatched the first vessel with a load of metal products to the Rostov region. In May 2023, DPR Acting Head Denis Pushilin announced that the first ship had been loaded with grain in the Mariupol port.*jk