Donetsk, Jul 15 — DAN. A water pipe connecting the Khanzhenkovskoye water reservoir and the Seversky Donets canal has been launched, the DPR Ministry of Construction said.
“The water pipe has been put into operation,” the Ministry said.
The length of the pipe is 21.5 km, it will pump up to 70,000 cubic meters of water per day. *ot